Treating a fractured rock face

Slopes & rock

Slope & rock stabilisation

Slopes fail when water builds up and the soil or rock loses its grip. We combine drainage, PU injection, rock gluing and helical anchors to hold the slope together and keep water out.

Open folder · 7 photos

Where we use it

Common jobs.

01

Slope protection

  • Holding retaining walls and embankments against sliding
  • Tying back steep slopes at risk of erosion
  • Anchoring wire mesh and geogrids

02

Retaining structures

  • Tie-back earth retaining systems
  • Reducing pressure on retaining walls with a lightweight fill

The story

Keep the water out. Hold the ground.

In Malaysia's heavy rain, water soaks into a slope, pore pressure rises and the soil loses strength. Seepage carries fine soil out, tension cracks open at the crest and the slope starts to move. On rock faces, water opens up joints and fissures until blocks loosen.

Read moreShow less

Our slope toolbox

  • Drainage and filters to lower the water level and stop seepage washing soil out.
  • PU injection to fill voids and cracks and strengthen the soil behind the face.
  • Rock gluing: PU resin injected into fractures, joints and fissures binds the rock mass together. The same technique has been used to secure mine roofs since the 1960s.
  • Helical anchors and soil screws that tie the moving soil back to stable ground, with a facing to support the surface.

Measured, not assumed

Each slope starts with investigation and access planning, and ends with verification and monitoring: survey points, piezometers and crack markers, read after heavy rain. A slope repair only works if drainage and support work together, so we design them as one system.

New cracks at the top of a slope, or water seeping from the face? Get it checked early.

Slope rehabilitation

Five steps to a stable slope.

  1. 01

    Investigate

    Site access, survey and soil or rock testing.

  2. 02

    Control water

    Surface drains and subsoil drainage to cut pore pressure.

  3. 03

    Inject

    PU injection or rock gluing to fill and bind the ground.

  4. 04

    Anchor

    Helical anchors or soil screws where the slope needs tying back.

  5. 05

    Monitor

    Movement, groundwater and crack readings after heavy rain.

Tell us what's moving. We'll tell you how to fix it.

Send us a photo of the problem.

Talk to us

Choose who to contact. WhatsApp photos of the problem and your site location for a faster answer.

Mon–Fri, 9am–5pm

Send an enquiry form instead →

100%