Expressway bridge approach before rehabilitation

Roads, bridges & culverts

Road, bridge & culvert approach repair

That bump where the road meets the bridge is the embankment settling while the piled bridge stays put. We inject polyurethane under the approach to fill the voids, strengthen the fill and bring the road back to level.

Open folder · 23 photos

Where we use it

Common jobs.

01

Roads & highways

  • Voids under roads, highways and runways
  • Strengthening the base under highway asphalt
  • Improving support under railway track beds

02

Bridge & culvert approaches

  • Filling the ground under approaches
  • Realigning bridge approach slabs

03

Lightweight road base

  • Pavements in high water table areas
  • Keeping road bases level
  • Preventing uneven settlement in embankments

The story

Bumps at bridge approach.

Bridges and culverts sit on piles. The embankment leading up to them sits on soil, often soft. Over time the fill settles and voids open under the approach slab, so a step forms at the joint. Resurfacing again and again only adds weight (the "mushroom effect") and the bump returns.

Read moreShow less

How we treat an approach

We work in stages. First, voids directly under the approach slab are filled with PU foam. Next, we drill through the slab and inject beneath the piled embankment slab to create a curtain that stops fill migrating. Finally, the compacted fill at the transition between the embankment and the piled section is injected at 1–2 m spacing to strengthen it and even out settlement.

Much of the work is done at night under lane closures. The foam sets quickly, so closures are short compared with excavation and rebuilding.

Where we work

  • Expressway and federal road bridge approaches
  • Culvert crossings and approach embankments
  • Depressed or faulted pavement sections and runways, taxiways and aprons
  • Abutment slopes with voids under the slope protection

Our track record includes expressway, highway and bridge abutment projects in Selangor, Pahang and Johor; see Projects.

  • 1–2 mTypical injection spacing at approaches
  • NightWorks under short lane closures
  • 3 stagesVoid filling, curtain, fill strengthening
  • Before & afterProbe, plate load and level monitoring

Managing a road or bridge with a recurring bump? Talk to us about a trial section.

Projects

Related project

How we work

Stage by stage. Lane by lane.

  1. 01

    Investigate

    Probe tests, resistivity and level surveys locate voids and weak fill.

  2. 02

    Stage 1: voids

    Voids under the approach slab are filled with PU foam.

  3. 03

    Stage 2: curtain

    PU is injected beneath the piled embankment slab to stop fill migrating.

  4. 04

    Stage 3: fill

    Transition fill is injected at 1–2 m spacing to strengthen it.

  5. 05

    Monitor

    Settlement markers are read over the following months.

FAQ

Frequently asked questions

Do you need to close the road?

Usually only one lane at a time, often at night. The foam sets quickly, so closures are much shorter than for excavation.

Why does the bump keep coming back after resurfacing?

Resurfacing adds weight to fill that is still settling. Injection fills the voids and strengthens the fill itself, which treats the cause.

Tell us what's moving. We'll tell you how to fix it.

Send us a photo of the problem.

Talk to us

Choose who to contact. WhatsApp photos of the problem and your site location for a faster answer.

Mon–Fri, 9am–5pm

Send an enquiry form instead →

100%