Earthworks and dredging. Desilting and maintenance works at Tasik Titiwangsa for Dewan Bandaraya Kuala Lumpur (DBKL), completed in June 2026. Long-reach excavators worked from the lake edge and from floating pontoons.

Expressways, bridge abutments, process plants and homes. Each project was tested before and after treatment, with settlement monitoring where the client required it.
Selected work
From our presentation material. Project names are shown once each client has agreed.
Kuala Lumpur
Earthworks and dredging. Desilting and maintenance works at Tasik Titiwangsa for Dewan Bandaraya Kuala Lumpur (DBKL), completed in June 2026. Long-reach excavators worked from the lake edge and from floating pontoons.
Klang, Selangor
Earthworks and dredging. Desilting and drainage system maintenance at Lebuh Kebun Nenas, Klang, for Jabatan Pengairan dan Saliran (JPS), completed in September 2026.
Highway
KM 48.7–48.85 eastbound, Pahang
Pavement defects: shallow PU injection. Geotechnical assessment and injection works for a depressed pavement section. Probe tests before and after injection showed the sub-grade re-strengthened.
Bridge
Pulau Indah Expressway (Phase 2), Selangor
Bridge abutment rehabilitation. Void filling under the approach slab, PU injection beneath the piled embankment slab, and ground stabilisation at the transition zone, with settlement monitoring afterwards.
Industrial
Kuantan, Pahang
Soil settlement: engineering, procurement and construction. Soil settlement remediation at a plant area on very soft sandy silt. Laboratory tests on treated samples showed higher undrained shear strength and stiffness.
Highway
Johor
Void and cavity stabilisation at a transition zone. Stabilisation of voids between a piled embankment slab and the embankment fill. Plate loading tests after injection recorded bearing pressures above the design criteria.
Bridge
South Klang Valley Expressway, Selangor
Bridge abutment rehabilitation. Inspection below the abutment, PU void filling and plugging, and injection works, with settlement monitoring.
Bridge
Bridge approach and Sg Gulang-Gulang culvert approach, Selangor
Ground rehabilitation research works. Alternative ground rehabilitation using PU foam injection at a bridge approach and a culvert approach, carried out as research with JKR, with settlement monitoring.
No projects listed in this sector yet. WhatsApp us to talk about your site.
Who we work for
Each sector has its own photo folder, with the problems and techniques that apply.
All expertise
8 photos
Residential & commercial
Homes & Property
Terrace houses, bungalows, shophouses and low-rise buildings.
9 photos
Industrial
Factories & Industrial Plants
Factory floors, process plants, pipe racks, pipelines and yards.
9 photos
Public works
Roads & Infrastructure
Expressways, bridges, culverts, slopes, railways and airports.