Kuala Lumpur
Tasik Titiwangsa
Earthworks and dredging. Desilting and maintenance works at Tasik Titiwangsa for Dewan Bandaraya Kuala Lumpur (DBKL), completed in June 2026. Long-reach excavators worked from the lake edge and from floating pontoons.

Public works
Expressways, federal roads, bridge abutments, culverts, slopes, railways and airport pavements. We repair settlement through small holes, often at night, with short lane closures.
Open folder · 9 photosFor road and asset owners

The recurring bump at a bridge approach, the sinking lane over a culvert and the void under an approach slab all come from the ground below the pavement. Resurfacing adds weight and the problem returns; our injection fills the voids and strengthens the fill itself.
Our track record includes pavement and bridge abutment rehabilitation on expressways and federal roads in Selangor, Pahang and Johor, and ground rehabilitation research with JKR. Results are measured with probe tests, plate load tests and settlement monitoring.
Problems we solve
23 photos
Roads, bridges & culverts
Road, Bridge & Culvert Approach
Bumps at bridge approaches, sinking lanes and faulted pavements.
8 photos
Voids & cavities
Sinkhole & Void Filling
Hidden voids and sinkholes filled before the ground collapses.
7 photos
Slopes & rock
Slope & Rock Stabilisation
Rock gluing, soil nails and helical anchors for unstable slopes.
Our techniques
8 photos
PolyGeo injection
PU Injection
Expanding polyurethane that fills voids and strengthens weak soil.
12 photos
Home-grown product
GeoPolyMattress
Buoyant mattress of lightweight blocks: a stable base on weak ground and high water tables.
14 photos
GeoMicroHelicS
Helical Piles & Underpinning
Steel helical piles screwed down to firm ground to support sinking footings.
5 photos
Testing & monitoring
Site Investigation & Monitoring
Probe tests, cone tests, resistivity and settlement monitoring.
Projects
Kuala Lumpur
Earthworks and dredging. Desilting and maintenance works at Tasik Titiwangsa for Dewan Bandaraya Kuala Lumpur (DBKL), completed in June 2026. Long-reach excavators worked from the lake edge and from floating pontoons.
Klang, Selangor
Earthworks and dredging. Desilting and drainage system maintenance at Lebuh Kebun Nenas, Klang, for Jabatan Pengairan dan Saliran (JPS), completed in September 2026.
Highway
KM 48.7–48.85 eastbound, Pahang
Pavement defects: shallow PU injection. Geotechnical assessment and injection works for a depressed pavement section. Probe tests before and after injection showed the sub-grade re-strengthened.
Photo folder
Photos from our sites. Tap any photo to view it larger.
Expressway bridge approach before rehabilitation
Crew injecting PU on a highway lane
Night works: drilling injection points
Under a bridge deck: checking the abutment
Foam filling voids under the abutment slope
Night injection at a bridge approach
Void under an approach slab packed with foam
JKR/Mackintosh probe test on a highway
Treating a fractured rock face
Managing a road, bridge or runway with a recurring problem? Talk to us about a trial section.

Tell us what's moving. We'll tell you how to fix it.